Home > Articles > Cisco Certification > CCIE > CCIE Routing and Switching v4.0: Troubleshooting Lab 1 (The Warm-Up)

CCIE Routing and Switching v4.0: Troubleshooting Lab 1 (The Warm-Up)

  • Sample Chapter is provided courtesy of Cisco Press.
  • Date: Dec 12, 2011.

Contents

  1. Equipment List
  2. Setting Up the Lab
  3. Pre-Lab Tasks

Chapter Description

This troubleshooting lab has been timed to last for 2 hours and be representative of the format and difficulty of the tasks you are likely to encounter on your CCIE lab exam.

Setting Up the Lab

Feel free to use any combination of routers and switches as long as you fulfill the requirements within the topology diagram, as shown in Figure 1-1. However, it is recommended to use the same model of equipment because doing so will make life easier should you load configurations directly from the supplied configurations into your own devices.

Figure 1-1

Figure 1-1. Lab 1 Topology Diagram

Lab Topology

This troubleshooting exercise uses the topology outlined in Figure 1-1, which you must re-create with your own equipment or by using lab equipment on the CCIE R&S 360 program.

Switch Instructions

Configure VLAN assignments from the configurations supplied or from Table 1-2.

Table 1-2. VLAN Assignment

VLAN

Switch 1

Switch 2

Switch 3

4

Fa0/46, Fa0/47

14

Fa0/47

20

Gi0/1, Gi0/2

Gi0/1, Gi0/2

27

Gi0/1, Fa0/7

37

Gi0/1

Gi0/1

Connect your switches together with fiber small form-factor pluggable (SFP) connectors or RJ045 Ethernet crossover cables, as shown in Figure 1-2.

Figure 1-2

Figure 1-2. Switch-to-Switch Connectivity

Frame Relay Instructions

Configure one of the routers you are going to use in the troubleshooting lab as a Frame Relay switch, or have a dedicated router assigned solely for this task. This troubleshooting lab uses a dedicated router for the Frame Relay switch. A fully meshed environment is configured between all the Frame Relay routers. Pay attention in the lab as to which permanent virtual circuits (PVC) are actually required.

If you are using your own equipment, keep the DCE cables at the frame switch end for simplicity and provide a clock rate to all links from this end.

The Frame Relay connectivity will, after configuration, represent the logical Frame Relay network, as shown in Figure 1-3.

Figure 1-3

Figure 1-3. Frame Relay Logical Connectivity

IP Address Instructions

For this exercise, you are required to configure your IP addresses, as shown in Figure 1-4, or load the initial router configurations supplied.

Figure 1-4

Figure 1-4. IP Addressing Diagram

3. Pre-Lab Tasks | Next Section Previous Section

Cisco Press Promotional Mailings & Special Offers

I would like to receive exclusive offers and hear about products from Cisco Press and its family of brands. I can unsubscribe at any time.